DFARS 252.227-7038 Patent Rights-Ownership by the Contractor (Large Business). Basic (Jun 2012) (Current)

As prescribed in 227.303(2), use the clause at 252.227-7038, Patent Rights—Ownership by the Contractor (Large Business), instead of the clause at FAR 52.227-11, in solicitations and contracts for experimental, developmental, or research work if—
(A) The contractor is other than a small business concern or nonprofit organization; and
(B) No alternative patent rights clause is used in accordance with FAR 27.303(c) or (e).
(ii) Use the clause with its Alternate I if—
(A) The acquisition of patent rights for the benefit of a foreign government is required under a treaty or executive agreement;
(B) The agency head determines at the time of award that it would be in the national interest to acquire the right to sublicense foreign governments or international organizations pursuant to any existing or future treaty or agreement; or
(C) Other rights are necessary to effect a treaty or agreement, in which case Alternate I may be appropriately modified.
(iii) Use the clause with its Alternate II in long-term contracts if necessary to effect treaty or agreements to be entered into.

PATENT RIGHTS—OWNERSHIP BY THE CONTRACTOR (LARGE BUSINESS) (JUN 2012)

      (a)  Definitions.  As used in this clause—

               “Invention” means—

              (1)  Any invention or discovery that is or may be patentable or otherwise protectable under Title 35 of the United States Code; or

              (2)  Any variety of plant that is or may be protectable under the Plant Variety Protection Act (7 U.S.C. 2321, et seq.).

              “Made”—

              (1)  When used in relation to any invention other than a plant variety, means the conception or first actual reduction to practice of the invention; or

              (2)  When used in relation to a plant variety, means that the Contractor has at least tentatively determined that the variety has been reproduced with recognized characteristics.

              “Nonprofit organization” means—

              (1)  A university or other institution of higher education;

              (2)  An organization of the type described in the Internal Revenue Code at 26 U.S.C. 501(c)(3) and exempt from taxation under 26 U.S.C. 501(a); or

              (3)  Any nonprofit scientific or educational organization qualified under a State nonprofit organization statute.

              “Practical application” means—

                (1)(i)  To manufacture, in the case of a composition or product;

                     (ii)  To practice, in the case of a process or method; or

                     (iii)  To operate, in the case of a machine or system; and

                (2)  In each case, under such conditions as to establish that—

                     (i)  The invention is being utilized; and

                     (ii)  The benefits of the invention are, to the extent permitted by law or Government regulations, available to the public on reasonable terms.

              “Subject invention” means any invention of the Contractor made in the performance of work under this contract.

      (b)  Contractor’s rights.

              (1)  Ownership.  The Contractor may elect to retain ownership of each subject invention throughout the world in accordance with the provisions of this clause.

              (2)  License.

                    (i)  The Contractor shall retain a nonexclusive royalty-free license throughout the world in each subject invention to which the Government obtains title, unless the Contractor fails to disclose the invention within the times specified in paragraph (c) of this clause.  The Contractor’s license—

                            (A)  Extends to any domestic subsidiaries and affiliates within the corporate structure of which the Contractor is a part;

                            (B)  Includes the right to grant sublicenses to the extent the Contractor was legally obligated to do so at the time of contract award; and

                            (C)  Is transferable only with the approval of the agency, except when transferred to the successor of that part of the Contractor’s business to which the invention pertains.

                     (ii)  The agency—

                            (A)  May revoke or modify the Contractor’s domestic license to the extent necessary to achieve expeditious practical application of the subject invention pursuant to an application for an exclusive license submitted in accordance with 37 CFR Part 404 and agency licensing regulations;

                            (B)  Will not revoke the license in that field of use or the geographical areas in which the Contractor has achieved practical application and continues to make the benefits of the invention reasonably accessible to the public; and

                            (C)  May revoke or modify the license in any foreign country to the extent the Contractor, its licensees, or the domestic subsidiaries or affiliates have failed to achieve practical application in that foreign country.

                     (iii)  Before revoking or modifying the license, the agency—

                            (A)  Will furnish the Contractor a written notice of its intention to revoke or modify the license; and

                            (B)  Will allow the Contractor 30 days (or such other time as the funding agency may authorize for good cause shown by the Contractor) after the notice to show cause why the license should not be revoked or modified. 

                     (iv)  The Contractor has the right to appeal, in accordance with 37 CFR Part 404 and agency regulations, concerning the licensing of Government-owned inventions, any decision concerning the revocation or modification of the license.

      (c)  Contractor’s obligations.

              (1)  The Contractor shall—

                    (i)  Disclose, in writing, each subject invention to the Contracting Officer within 2 months after the inventor discloses it in writing to Contractor personnel responsible for patent matters, or within 6 months after the Contractor first becomes aware that a subject invention has been made, whichever is earlier;

                    (ii)  Include in the disclosure—

                            (A)  The inventor(s) and the contract under which the invention was made;

                            (B)  Sufficient technical detail to convey a clear understanding of the invention; and

                            (C)  Any publication, on sale (i.e., sale or offer for sale), or public use of the invention and whether a manuscript describing the invention has been submitted for publication and, if so, whether it has been accepted for publication; and

                    (iii)  After submission of the disclosure, promptly notify the Contracting Officer of the acceptance of any manuscript describing the invention for publication and of any on sale or public use. 

              (2)  The Contractor shall elect in writing whether or not to retain ownership of any subject invention by notifying the Contracting Officer at the time of disclosure or within 8 months of disclosure, as to those countries (including the United States) in which the Contractor will retain ownership.  However, in any case where publication, on sale, or public use has initiated the 1-year statutory period during which valid patent protection can be obtained in the United States, the agency may shorten the period of election of title to a date that is no more than 60 days prior to the end of the statutory period.

              (3)  The Contractor shall—

                    (i)  File either a provisional or a nonprovisional patent application on an elected subject invention within 1 year after election, provided that in all cases the application is filed prior to the end of any statutory period wherein valid patent protection can be obtained in the United States after a publication, on sale, or public use;

                    (ii)  File a nonprovisional application within 10 months of the filing of any provisional application; and

                    (iii)  File patent applications in additional countries or international patent offices within either 10 months of the first filed patent application (whether provisional or nonprovisional) or 6 months from the date the Commissioner of Patents grants permission to file foreign patent applications where such filing has been prohibited by a Secrecy Order.

              (4)  The Contractor may request extensions of time for disclosure, election, or filing under paragraphs (c)(1), (2), and (3) of this clause.  The Contracting Officer will normally grant the extension unless there is reason to believe the extension would prejudice the Government’s interests.

      (d)  Government’s rights.

              (1)  Ownership.  The Contractor shall assign to the agency, upon written request, title to any subject invention—

                    (i)  If the Contractor elects not to retain title to a subject invention;

                    (ii)  If the Contractor fails to disclose or elect the subject invention within the times specified in paragraph (c) of this clause and the agency requests title within 60 days after learning of the Contractor’s failure to report or elect within the specified times;

                    (iii)  In those countries in which the Contractor fails to file patent applications within the times specified in paragraph (c) of this clause, provided that, if the Contractor has filed a patent application in a country after the times specified in paragraph (c) of this clause, but prior to its receipt of the written request of the agency, the Contractor shall continue to retain ownership in that country; and

                    (iv)  In any country in which the Contractor decides not to continue the prosecution of any application for, to pay the maintenance fees on, or defend in reexamination or opposition proceeding on, a patent on a subject invention.

              (2)  License.  If the Contractor retains ownership of any subject invention, the Government shall have a nonexclusive, nontransferable, irrevocable, paid-up license to practice, or have practiced for or on behalf of the United States, the subject invention throughout the world.

      (e)  Contractor action to protect the Government’s interest.

              (1)  The Contractor shall execute or have executed and promptly deliver to the agency all instruments necessary to—

                    (i)  Establish or confirm the rights the Government has throughout the world in those subject inventions in which the Contractor elects to retain ownership; and

                    (ii)  Assign title to the agency when requested under paragraph (d)(1) of this clause and enable the Government to obtain patent protection for that subject invention in any country.

              (2)  The Contractor shall—

                    (i)  Require, by written agreement, its employees, other than clerical and nontechnical employees, to—

                            (A)  Disclose each subject invention promptly in writing to personnel identified as responsible for the administration of patent matters, so that the Contractor can comply with the disclosure provisions in paragraph (c) of this clause; and

                            (B)  Provide the disclosure in the Contractor’s format, which should require, as a minimum, the information required by paragraph (c)(1) of this clause;

                    (ii)  Instruct its employees, through employee agreements or other suitable educational programs, as to the importance of reporting inventions in sufficient time to permit the filing of patent applications prior to U.S. or statutory foreign bars; and

                    (iii)  Execute all papers necessary to file patent applications on subject inventions and to establish the Government’s rights in the subject inventions. 

              (3)  The Contractor shall notify the Contracting Officer of any decisions not to file a nonprovisional patent application, continue the prosecution of a patent application, pay maintenance fees, or defend in a reexamination or opposition proceeding on a patent, in any country, not less than 30 days before the expiration of the response or filing period required by the relevant patent office.

              (4)  The Contractor shall include, within the specification of any United States nonprovisional patent application and any patent issuing thereon covering a subject invention, the following statement:  “This invention was made with Government support under (identify the contract) awarded by (identify the agency).  The Government has certain rights in this invention.”

              (5)  The Contractor shall—

                    (i)  Establish and maintain active and effective procedures to ensure that subject inventions are promptly identified and disclosed to Contractor personnel responsible for patent matters;

                    (ii)  Include in these procedures the maintenance of—

                            (A)  Laboratory notebooks or equivalent records and other records as are reasonably necessary to document the conception and/or the first actual reduction to practice of subject inventions; and

                            (B)  Records that show that the procedures for identifying and disclosing the inventions are followed; and

                    (iii)  Upon request, furnish the Contracting Officer a description of these procedures for evaluation and for determination as to their effectiveness.

              (6)  The Contractor shall, when licensing a subject invention, arrange to—

                    (i)  Avoid royalty charges on acquisitions involving Government funds, including funds derived through the Government’s Military Assistance Program or otherwise derived through the Government;

                    (ii)  Refund any amounts received as royalty charges on the subject inventions in acquisitions for, or on behalf of, the Government; and

                    (iii)  Provide for the refund in any instrument transferring rights in the invention to any party.

              (7)  The Contractor shall furnish to the Contracting Officer the following:

                    (i)  Interim reports every 12 months (or any longer period as may be specified by the Contracting Officer) from the date of the contract, listing subject inventions during that period and stating that all subject inventions have been disclosed or that there are no subject inventions.

                    (ii)  A final report, within 3 months after completion of the contracted work, listing all subject inventions or stating that there were no subject inventions, and listing all subcontracts at any tier containing a patent rights clause or stating that there were no subcontracts.

              (8)(i)  The Contractor shall promptly notify the Contracting Officer in writing upon the award of any subcontract at any tier containing a patent rights clause by identifying—

                            (A)  The subcontractor;

                            (B)  The applicable patent rights clause;

                            (C)  The work to be performed under the subcontract; and

                            (D)  The dates of award and estimated completion.

               (ii)  The Contractor shall furnish, upon request, a copy of the subcontract, and no more frequently than annually, a listing of the subcontracts that have been awarded.

              (9)  In the event of a refusal by a prospective subcontractor to accept one of the clauses specified in paragraph (l)(1) of this clause, the Contractor—

                    (i)  Shall promptly submit a written notice to the Contracting Officer setting forth the subcontractor’s reasons for the refusal and other pertinent information that may expedite disposition of the matter; and

                    (ii)  Shall not proceed with that subcontract without the written authorization of the Contracting Officer.

              (10)  The Contractor shall provide to the Contracting Officer, upon request, the following information for any subject invention for which the Contractor has retained ownership:

                    (i)  Filing date.

                    (ii)  Serial number and title.

                    (iii)  A copy of any patent application (including an English-language version if filed in a language other than English).

                    (iv)  Patent number and issue date.

              (11)  The Contractor shall furnish to the Government, upon request, an irrevocable power to inspect and make copies of any patent application file.

      (f)  Reporting on utilization of subject inventions.

              (1)  The Contractor shall—

                    (i)  Submit upon request periodic reports no more frequently than annually on the utilization of a subject invention or on efforts in obtaining utilization of the subject invention that are being made by the Contractor or its licensees or assignees;

                    (ii)  Include in the reports information regarding the status of development, date of first commercial sale or use, gross royalties received by the Contractor, and other information as the agency may reasonably specify; and

                    (iii)  Provide additional reports that the agency may  request in connection with any march-in proceedings undertaken by the agency in accordance with paragraph (h) of this clause.

              (2)  To the extent permitted by law, the agency shall not disclose the information provided under paragraph (f)(1) of this clause to persons outside the Government without the Contractor’s permission, if the data or information is considered by the Contractor or its licensee or assignee to be “privileged and confidential” (see 5 U.S.C. 552(b)(4)) and is so marked.

      (g)  Preference for United States industry.  Notwithstanding any other provision of this clause, the Contractor agrees that neither the Contractor nor any assignee shall grant to any person the exclusive right to use or sell any subject invention in the United States unless the person agrees that any products embodying the subject invention or produced through the use of the subject invention will be manufactured substantially in the United States.  However, in individual cases, the agency may waive the requirement for an exclusive license agreement upon a showing by the Contractor or its assignee that—

              (1)  Reasonable but unsuccessful efforts have been made to grant licenses on similar terms to potential licensees that would be likely to manufacture substantially in the United States; or             

              (2)  Under the circumstances, domestic manufacture is not commercially feasible.

      (h)  March-in rights.  The Contractor acknowledges that, with respect to any subject invention in which it has retained ownership, the agency has the right to require licensing pursuant to 35 U.S.C. 203 and 210(c), 37 CFR 401.6, and any supplemental regulations of the agency in effect on the date of contract award.

      (i)  Other inventions.  Nothing contained in this clause shall be deemed to grant to the Government any rights with respect to any invention other than a subject invention.

      (j)  Examination of records relating to inventions.

              (1)  The Contracting Officer or any authorized representative shall, until 3 years after final payment under this contract, have the right to examine any books (including laboratory notebooks), records, and documents of the Contractor relating to the conception or first reduction to practice of inventions in the same field of technology as the work under this contract to determine whether—

                    (i)  Any inventions are subject inventions;

                    (ii)  The Contractor has established procedures required by paragraph (e)(5) of this clause; and

                    (iii)  The Contractor and its inventors have complied with the procedures.

              (2)  If the Contracting Officer learns of an unreported Contractor invention that the Contracting Officer believes may be a subject invention, the Contractor shall be required to disclose the invention to the agency for a determination of ownership rights.

              (3)  Any examination of records under this paragraph (j) shall be subject to appropriate conditions to protect the confidentiality of the information involved.

      (k)  Withholding of payment (this paragraph does not apply to subcontracts).

              (1)  Any time before final payment under this contract, the Contracting Officer may, in the Government’s interest, withhold payment until a reserve not exceeding $50,000 or 5 percent of the amount of the contract, whichever is less, is set aside if, in the Contracting Officer’s opinion, the Contractor fails to—

                    (i)  Establish, maintain, and follow effective procedures for identifying and disclosing subject inventions pursuant to paragraph (e)(5) of this clause;

                    (ii)  Disclose any subject invention pursuant to paragraph (c)(1) of this clause;

                    (iii)  Deliver acceptable interim reports pursuant to paragraph (e)(7)(i) of this clause; or

                    (iv)  Provide the information regarding subcontracts pursuant to paragraph (e)(8) of this clause.

              (2)  The reserve or balance shall be withheld until the Contracting Officer has determined that the Contractor has rectified whatever deficiencies exist and has delivered all reports, disclosures, and other information required by this clause.

              (3)  The Government will not make final payment under this contract before the Contractor delivers to the Contracting Officer—

                    (i)  All disclosures of subject inventions required by paragraph (c)(1) of this clause;

                    (ii)  An acceptable final report pursuant to paragraph (e)(7)(ii) of this clause; and

                    (iii)  All past due confirmatory instruments.

              (4)  The Contracting Officer may decrease or increase the sums withheld up to the maximum authorized in paragraph (k)(1) of this clause.  No amount shall be withheld under this paragraph while the amount specified by this paragraph is being withheld under other provisions of the contract.  The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.

      (l)  Subcontracts.

              (1)  The Contractor—

                    (i)  Shall include the substance of the Patent Rights—Ownership by the Contractor clause set forth at 52.227-11 of the Federal Acquisition Regulation (FAR), in all subcontracts for experimental, developmental, or research work to be performed by a small business concern or nonprofit organization; and 

                    (ii)  Shall include the substance of this clause, including this paragraph (l), in all other subcontracts for experimental, developmental, or research work, unless a different patent rights clause is required by FAR 27.303.

              (2)  For subcontracts at any tier—

                    (i)  The patents rights clause included in the subcontract shall retain all references to the Government and shall provide to the subcontractor all the rights and obligations provided to the Contractor in the clause.  The Contractor shall not, as consideration for awarding the subcontract, obtain rights in the subcontractor’s subject inventions; and

                    (ii)  The Government, the Contractor, and the subcontractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and the Government with respect to those matters covered by this clause.  However, nothing in this paragraph is intended to confer any jurisdiction under the Contract Disputes statute in connection with proceedings under paragraph (h) of this clause.

(End of clause)

(l) Subcontracts. (1) The Contractor— (i) Shall include the substance of the Patent Rights—Ownership by the Contractor clause set forth at 52.227-11 of the Federal Acquisition Regulation (FAR), in all subcontracts for experimental, developmental, or research work to be performed by a small business concern or nonprofit organization; and (ii) Shall include the substance of this clause, including this paragraph (l), in all other subcontracts for experimental, developmental, or research work, unless a different patent rights clause is required by FAR 27.303. (2) For subcontracts at any tier— (i) The patents rights clause included in the subcontract shall retain all references to the Government and shall provide to the subcontractor all the rights and obligations provided to the Contractor in the clause. The Contractor shall not, as consideration for awarding the subcontract, obtain rights in the subcontractor’s subject inventions; and (ii) The Government, the Contractor, and the subcontractor agree that the mutual obligations of the parties created by this clause constitute a contract between the subcontractor and the Government with respect to those matters covered by this clause. However, nothing in this paragraph is intended to confer any jurisdiction under the Contract Disputes statute in connection with proceedings under paragraph (h) of this clause.

Mandatory (Exception);
Small business ✖ Not a major defense system ✖ Non-R&D ✖ 
✔ >52.227-11 Basic

52.227-1 Authorization and Consent.

52.227-10 Filing of Patent Applications-Classified Subject Matter.

52.227-11 Patent Rights-Ownership by the Contractor.

52.227-13 Patent Rights-Ownership by the Government.

52.227-14 Rights in Data-General.

52.227-15 Representation of Limited Rights Data and Restricted Computer Software.

52.227-16 Additional Data Requirements.

52.227-17 Rights in Data-Special Works.

52.227-19 Commercial Computer Software License.

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement.

52.227-20 Rights in Data-SBIR Program.

52.227-21 Technical Data Declaration, Revision, and Withholding of Payment-Major Systems.

52.227-22 Major System-Minimum Rights.

52.227-23 Rights to Proposal Data (Technical).

52.227-3 Patent Indemnity.

52.227-4 Patent Indemnity-Construction Contracts.

52.227-6 Royalty Information.

52.227-7 Patents-Notice of Government Licensee.

52.227-9 Refund of Royalties.

252.217-7026 Identification of Sources of Supply.

252.227-7000 Non-Estoppel.

252.227-7001 Release of Past Infringement.

252.227-7002 Readjustment of Payments.

252.227-7003 Termination.

252.227-7004 License Grant.

252.227-7005 License Term.

252.227-7006 License Grant---Running Royalty.

252.227-7007 License Term--Running Royalty.

252.227-7008 Computation of Royalties.

252.227-7009 Reporting and Payment of Royalties.

252.227-7010 License to Other Government Agencies.

252.227-7011 Assignments.

252.227-7013 Rights in Technical Data--Noncommercial Items.

252.227-7014 Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation.

252.227-7015 Technical Data–Commercial Items.

252.227-7016 Rights in Bid or Proposal Information.

252.227-7017 Identification and Assertion of Use, Release, or Disclosure Restrictions.

252.227-7018 Rights in Noncommercial Technical Data and Computer Software--Small Business Innovation Research (SBIR) Program.

252.227-7019 Validation of Asserted Restrictions--Computer Software.

252.227-7020 Rights in Special Works.

252.227-7021 Rights in Data--Existing Works.

252.227-7022 Government Rights (Unlimited).

252.227-7023 Drawings and Other Data to Become Property of Government.

252.227-7024 Notice and Approval of Restricted Designs.

252.227-7025 Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends.

252.227-7026 Deferred Delivery of Technical Data or Computer Software.

252.227-7027 Deferred Ordering of Technical Data or Computer Software.

252.227-7028 Technical Data or Computer Software Previously Delivered to the Government.

252.227-7032 Rights in Technical Data and Computer Software (Foreign).

252.227-7037 Validation of Restrictive Markings on Technical Data.

252.227-7039 Patents--Reporting of Subject Inventions.

252.246-7001 Warranty of Data.

1852.227-11 Patent Rights--Retention by the Contractor (Short Form).

1852.227-14 Rights in Data--General.

1852.227-19 Commercial Computer Software--Restricted Rights.

1852.227-70 New Technology-Other than a Small Business Firm or Nonprofit Organization.

1852.227-71 Requests for Waiver of Rights to Inventions.

1852.227-72 Designation of New Technology Representative and Patent Representative.

1852.227-84 Patent Rights Clauses.

1852.227-85 Invention Reporting and Rights--Foreign.

1852.227-86 Commercial Computer Software--Licensing.

1852.227-88 Government-furnished computer software and related technical data.

5252.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)

5252.247-9505 TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)

5252.227-9501 Invention Disclosures and Reports (NAVAIR) (May 1998)

5252.227-9511 Disclosure, Use and Protection of Proprietary Information (NAVAIR) (Feb 2009)

5252.227-9216 Pre-award Identification and Assertion of Restrictions on Technical Data Pertaining to a Commercial Item and Commercial Computer Software

5252.227-9512 TRADEMARK MANUFACTURE/USE LICENSE AGREEMENT (NAVAIR)

552.227-70 Government Rights (Unlimited).

552.227-71 Drawings and Other Data to Become Property of Government.

1452.227-70 Appeals of Use or Exceptions.

752.227-14 Rights in Data-general.

752.227-70 Patent reporting procedures.

952.227-84 Notice of right to request patent waiver.

970.5204-3 Access to and ownership of records.

970.5227-1 Rights in Data-Facilities

970.5227-2 Rights in Data-Technology Transfer.

1352.201-71 Ratification release.

Working with a set of FAR clauses from an RFP or contract?

Try pasting them into our tool to instantly generate a risk profile, including the basic flow down recommendation.

Info

Works best with Chrome and Edge browsers!